Our Services

BDA / DAS Solutions

In-building radio coverage designed, installed and certified to the code the fire marshal tests against.

In-Building Coverage, Surveyed and Certified

Concrete, steel, coated glass and below-grade levels all absorb radio signal. A building with strong coverage outside can still leave a responder in a stairwell with no way to call out, and that is exactly where coverage matters most.

CitiComm surveys the building, designs the amplification, installs it and certifies it. We cover public safety radio, commercial two-way and cellular, and we keep the certification current year after year.

NFPA
and IFC compliant

Systems designed to the in-building radio coverage codes.

3
System types

Public safety, commercial two-way and cellular coverage.

Annual
Recertification

Coverage retested each year and after any renovation.

24/7
Service behind it

Emergency response whenever an amplifier or antenna run needs attention.

Why it matters

Why In-Building Coverage Deserves a Specialist

Emergency responder radio coverage is a life safety system, and the authorities who approve it treat it that way. CitiComm surveys, designs, installs and certifies each system to the code your fire marshal tests against, then keeps it certified year after year. You get a building that passes inspection the first time, and a system you can rely on long after the certificate is signed.

Book an onsite assessment

Compliance, built in

NFPA and the International Fire Code require responder coverage in most new commercial buildings. We design to those standards from the first drawing, so approval goes smoothly.

Coverage you can prove

Every floor is grid tested and documented, so the certificate reflects real measured signal. Your fire marshal sees the numbers, and so do you.

Certified year after year

Renovations and new construction nearby change how signal moves through a building. Annual retesting is part of our service agreement, with the paperwork handled before it comes due.

What We Engineer

Four kinds of in-building system, each designed, installed and documented by the same team.

Public Safety BDA

Emergency responder coverage designed to the fire code, so police, fire and EMS stay in contact in stairwells, basements and service corridors, and your building passes inspection the first time.

  • Code Compliancedesigned to NFPA and IFC coverage requirements
  • Grid Testingfloor-by-floor measurement against the pass criteria
  • AHJ Acceptancedocumentation prepared for the authority having jurisdiction
Public Safety

Commercial Coverage

Whole-building two-way radio coverage for large facilities, so your staff are reachable from the loading dock to the top floor, wherever the work takes them.

  • Whole Buildingcoverage from the loading dock to the top floor
  • Large Facilitieshotels, plants, schools, warehouses and offices
  • Productivityfewer trips, faster response and safer operations
Property Management

Cellular BDA and DAS

Carrier signal amplified and distributed through the structure, so phones work on every floor for tenants, guests and staff alike.

  • Signal Boostcarrier signal amplified and redistributed inside
  • Full Coverageevery occupied area brought up to usable service
  • Carrier Approvalwork coordinated with the carriers where required
System Design

Testing and Certification

Site assessment, acceptance testing and annual recertification, documented to the standard an inspector or insurer expects, and handled before the deadline arrives.

  • Site Assessmentsurvey of the structure before anything is designed
  • Acceptance Testmeasured results against the coverage pass criteria
  • Annual Recertretested each year and after structural changes
Service Agreements

What You Receive

In-building coverage is a documented system. These are the deliverables that prove it works and keep it signed off year after year.

Coverage Survey

A grid test of the building measuring signal strength floor by floor, showing exactly where coverage passes and where it falls short.

System Design

Amplifier sizing, antenna placement and cable runs documented in full, so the installation is built to an approved drawing.

AHJ Submittal

The documentation package the authority having jurisdiction expects, prepared and submitted by us so approval moves quickly.

Installation

Amplifiers, antennas, cabling and monitoring installed by our own technicians, commissioned and tuned before anything is signed off.

Certification Report

Measured acceptance test results against the pass criteria, the document that proves the building meets the coverage requirement.

Annual Recertification

A yearly retest to keep the certification valid, plus a retest after renovations that change how the signal moves.

System Specifications

The system in plain terms, for the fire marshal, engineer or contractor signing off.

Designed to the code your jurisdiction enforces, so the system passes its inspection.

One design can carry first responder radio and your own radio fleet together.

Each component specified for your building, its size and its construction.

Every grid point recorded, so the report shows exactly what was proven.

A fault in the system is seen at the panel, the way the code requires.

We return each year, retest and refile, so the certificate stays current.

Have a building that needs to pass inspection?Ask about a survey

When Buildings Need This

New construction

Large commercial buildings must meet in-building radio coverage rules before occupancy, so the system belongs in the design phase.

A failed inspection

The fire marshal has tested coverage and the building fell short, and occupancy or a certificate now depends on correcting it.

After a renovation

New walls, glazing or fit-outs change how signal moves, which is why certification has to be renewed after structural work.

Known dead zones

Stairwells, basements, elevator shafts and parking structures where staff or responders lose contact on a regular basis.

How We Deliver It

Survey

We grid test the building and measure where coverage passes and where it falls short.

Design

Amplifiers, antennas and cable runs are sized and documented for approval.

Install

Our technicians install, commission and tune the system in the building.

Certify

Acceptance testing, the AHJ submittal and annual recertification after.

FAQs

For most large new commercial buildings, yes. NFPA and the International Fire Code set in-building coverage requirements, and the authority having jurisdiction tests against them.

With a grid test. The building is divided into test areas and signal is measured in each one, which produces a clear pass or fail against the code criteria for every floor.

We survey the building, design a system that closes the gaps, install it and submit the acceptance test, so the inspection can be signed off and the building can open.

Buildings change over time. New walls, glazing and fit-outs all affect how signal travels, so the code requires a retest each year and after any structural work.

Yes. Cellular BDA and DAS use the same approach, amplifying and redistributing carrier signal so phones work throughout the building, for tenants, guests and staff alike.

Yes. Most of our installations happen in working hospitals, hotels and offices, with the work scheduled around your operation and your quietest hours.

Related Services

Request a Quote

Tell us what you need to cover.

Send us the building, the square footage and whether this is new construction or a failed inspection. We will come back with a survey date.

Call us
877.850.0091
Emergency service
24/7

Coverage You Can Certify

Public safety, commercial and cellular in-building coverage across South Florida and the New York metro. Survey, design, install, certify.