In-building radio coverage designed, installed and certified to the code the fire marshal tests against.
Concrete, steel, coated glass and below-grade levels all absorb radio signal. A building with strong coverage outside can still leave a responder in a stairwell with no way to call out, and that is exactly where coverage matters most.
CitiComm surveys the building, designs the amplification, installs it and certifies it. We cover public safety radio, commercial two-way and cellular, and we keep the certification current year after year.
Systems designed to the in-building radio coverage codes.
Public safety, commercial two-way and cellular coverage.
Coverage retested each year and after any renovation.
Emergency response whenever an amplifier or antenna run needs attention.
Emergency responder radio coverage is a life safety system, and the authorities who approve it treat it that way. CitiComm surveys, designs, installs and certifies each system to the code your fire marshal tests against, then keeps it certified year after year. You get a building that passes inspection the first time, and a system you can rely on long after the certificate is signed.
Book an onsite assessmentNFPA and the International Fire Code require responder coverage in most new commercial buildings. We design to those standards from the first drawing, so approval goes smoothly.
Every floor is grid tested and documented, so the certificate reflects real measured signal. Your fire marshal sees the numbers, and so do you.
Renovations and new construction nearby change how signal moves through a building. Annual retesting is part of our service agreement, with the paperwork handled before it comes due.
Four kinds of in-building system, each designed, installed and documented by the same team.
Emergency responder coverage designed to the fire code, so police, fire and EMS stay in contact in stairwells, basements and service corridors, and your building passes inspection the first time.
Whole-building two-way radio coverage for large facilities, so your staff are reachable from the loading dock to the top floor, wherever the work takes them.
Carrier signal amplified and distributed through the structure, so phones work on every floor for tenants, guests and staff alike.
Site assessment, acceptance testing and annual recertification, documented to the standard an inspector or insurer expects, and handled before the deadline arrives.
In-building coverage is a documented system. These are the deliverables that prove it works and keep it signed off year after year.
A grid test of the building measuring signal strength floor by floor, showing exactly where coverage passes and where it falls short.
Amplifier sizing, antenna placement and cable runs documented in full, so the installation is built to an approved drawing.
The documentation package the authority having jurisdiction expects, prepared and submitted by us so approval moves quickly.
Amplifiers, antennas, cabling and monitoring installed by our own technicians, commissioned and tuned before anything is signed off.
Measured acceptance test results against the pass criteria, the document that proves the building meets the coverage requirement.
A yearly retest to keep the certification valid, plus a retest after renovations that change how the signal moves.
The system in plain terms, for the fire marshal, engineer or contractor signing off.
Designed to the code your jurisdiction enforces, so the system passes its inspection.
One design can carry first responder radio and your own radio fleet together.
Each component specified for your building, its size and its construction.
Every grid point recorded, so the report shows exactly what was proven.
A fault in the system is seen at the panel, the way the code requires.
We return each year, retest and refile, so the certificate stays current.
Have a building that needs to pass inspection?Ask about a survey
Large commercial buildings must meet in-building radio coverage rules before occupancy, so the system belongs in the design phase.
The fire marshal has tested coverage and the building fell short, and occupancy or a certificate now depends on correcting it.
New walls, glazing or fit-outs change how signal moves, which is why certification has to be renewed after structural work.
Stairwells, basements, elevator shafts and parking structures where staff or responders lose contact on a regular basis.
We grid test the building and measure where coverage passes and where it falls short.
Amplifiers, antennas and cable runs are sized and documented for approval.
Our technicians install, commission and tune the system in the building.
Acceptance testing, the AHJ submittal and annual recertification after.
Send us the building, the square footage and whether this is new construction or a failed inspection. We will come back with a survey date.
Public safety, commercial and cellular in-building coverage across South Florida and the New York metro. Survey, design, install, certify.